Short answer

Install a vapor-permeable water-resistive barrier rated between 10 and 20 perms on the exterior side of the plywood sheathing to allow outward drying while preventing solar-driven moisture from the brick veneer from saturating the wood framing.

Install a vapor-permeable water-resistive barrier rated between 10 and 20 perms on the exterior side of the plywood sheathing to allow outward drying while preventing solar-driven moisture from the brick veneer from saturating the wood framing.

Brick veneer acts as a reservoir cladding, storing bulk rainwater and driving inward water vapor toward the framing cavity when heated by the sun. With 7.25 inches of exterior mineral wool providing roughly R-29 to R-30 of continuous insulation, the plywood sheathing stays warm in cold weather, but it requires a controlled outward-drying pathway to prevent wood decay.

If you only do one thing: Select a continuous, vapor-permeable weather-resistive barrier (WRB) rated between 10 and 20 perms (ASTM E96 Method A/B) and tape all seams directly over the plywood before installing your insulation brackets.

  • Vapor Permeance Threshold: A membrane with 10 to 20 perms—a moderate vapor-permeable Class III profile—strikes the correct balance, allowing the plywood substrate to dry outward through the mineral wool while limiting inward solar vapor drives from sun-baked brick.
  • Continuous Insulation R-Value: Installing 7.25-inch mineral wool batts in brackets delivers approximately R-30 continuous insulation, shifting the winter dew point well outside the structural plywood sheathing across all North American climate zones (IECC Climate Zones 1 through 8).
  • Bracket Attachment: InSoFast Batt-Brackets engineered for 7.25-inch depths fasten through the WRB and plywood directly into the 2x4 framing studs, isolating thermal bridging and holding steel-stud-width (16.25-inch or 24.25-inch) high-density batts securely against the wall.
  • Air Barrier Continuity: The WRB layer on the plywood acts as the primary exterior air barrier; seal all bracket fastener penetrations, laps, window flashings, and transitions with compatible exterior acrylic seam tape or sealant to prevent air leakage.
  • Cavity Ventilation: Maintain a clear 1-inch minimum air gap between the outer face of the mineral wool and the brick veneer, supported by open weep holes at 24 inches on center along the bottom course to drain water and vent moisture.
  • Watch out for: Installing an impermeable Class I vapor barrier (under 0.1 perm, such as polyethylene or foil facers) on the exterior plywood, which traps trapped cavity moisture and rots the sheathing.
  • Watch out for: Omitting mortar deflectors or mesh in the 1-inch cavity, allowing excess mortar droppings to bridge the air gap and compress the mineral wool batts against the brickwork.
  • Watch out for: Unsealed fastener penetrations where brackets screw through the WRB into wood studs, which create localized air and bulk water leaks under high wind-load pressures.

Verify that your chosen WRB membrane meets ASTM E2178 for air barrier performance and ASTM E96 for 10–20 perm vapor transmission before fastening your 7.25-inch bracket system.